ISO 9001:2015 + CE, audited every year
Quality management audited annually by TÜV SÜD. Every machine ships with a CE Declaration of Conformity, electrical schematics and an operation manual in your language.
TÜV SÜD · annual audit
24h quotation · ISO 9001:2015 + CE · 12 service hubs
OEM manufacturer since 1998
ApexForge designs and builds CNC machining centers, hydraulic presses, extrusion, drying and packaging lines — then integrates them into the plant you already run. Standalone machines or a full turnkey line, always with on-site commissioning, operator training and a 2-year mechanical warranty.
Fig. 01 — Platform
5-Axis Machining Center · AF-C250
88%
88% OEE at month six
38k
38,000 m³/yr veneer dried
Why ApexForge
There are thousands of machine vendors in this price bracket. The difference is never unit price — it is who stands behind your throughput number, and who is still on your floor after the container is unpacked.
Quality management audited annually by TÜV SÜD. Every machine ships with a CE Declaration of Conformity, electrical schematics and an operation manual in your language.
TÜV SÜD · annual audit
Mechanical, electrical, controls and process engineers on staff. They do the application engineering — layout, capacity matching, upstream and downstream integration — at no extra charge.
80+ application engineers
Local engineers for installation, warranty and spare parts. 24-hour response on active projects, and consumable kits ship from the nearest hub instead of from China.
24h response on live projects
Product range
Six core platforms across forming, machining, drying, extrusion and packaging. Each ships in documented configurations — and we size it against the throughput number you actually have to hit.
AF-C250MOQ: 1 unit
USD 380,000 – 520,000 / unit
AF-PB-12MOQ: 1 set
USD 165,000 – 280,000 / set
AF-HP-1000MOQ: 1 unit
USD 220,000 – 380,000 / unit
AF-PE-110MOQ: 1 line
USD 320,000 – 580,000 / line
AF-VD-2400MOQ: 1 set
USD 180,000 – 320,000 / set
AF-SW-1300MOQ: 1 unit
USD 145,000 – 240,000 / unit
Applications
We do not put a machine into an industry we are guessing at. Each vertical has a dedicated process team that knows your material, your throughput math and your compliance regime.
316L stainless and NSF/ANSI 61 certified brass parts for food processing, beverage, and dairy equipment.
Explore industry5-axis CNC machining centers, hydraulic presses, laser cutters and welding cells for steel, aluminum and exotic alloys.
Explore industryAutomatic filling, capping, labeling and palletizing lines for food, beverage, pharmaceutical and consumer-goods packaging.
Explore industryInjection molding machines, extruders, blow molders and PET preform systems for plastics converters worldwide.
Explore industryFlexo / gravure presses, slitter-rewinders, die cutters and laminators for label, flexible packaging and paper-converting mills.
Explore industrySolar tracker components, wind turbine sensor housings, battery energy storage system (BESS) parts.
Explore industryVeneer dryers, hot-press laminating lines, panel saws, edge banders for furniture, plywood, MDF and LVL manufacturers.
Explore industryProof
Customer names are withheld under NDA. Every figure below was verified against the customer’s own plant records before publication.
Confidential (top-3 Saudi Arabian bottled water producer)
Greenfield 60,000 BPH water bottling line: blowing, filling, capping, labeling, shrink-wrapping and palletizing. Cold-start to first commercial sale in 7 months (vs 14-month industry average). OEE run
“ApexForge delivered a complete 60,000 BPH water bottling line from kickoff to first commercial sale in 7 months. Their project team handled everything — layout, machines, integration with our existing utilities, operator training and regulatory documentation. Six months in, our OEE is 88% — which is”
Confidential (top-10 Vietnamese plywood exporter)
Replaced three legacy Chinese-made jet-box dryers with two AF-VD-2400 roller dryers. Annual throughput doubled from 18,000 m³ to 38,000 m³. Veneer defect rate fell from 5.8% to 0.9%. Energy consumptio
“The old jet-box dryers were 18 years old and we had stopped getting spare parts. ApexForge proposed two AF-VD-2400 roller dryers with biomass hot-water heating — we already had a biomass boiler so the integration was simple. They commissioned both machines in 8 weeks and our operators were running f”
Confidential (Boston-based Series B robotics startup)
Compressed 4-month timeline into 6 weeks. 50 functional prototypes in week 3, then ramped to 800 pieces/month in week 8. Zero defects on first 8 production batches (6,400 parts). Cpk > 1.67 on all 5 c
“We were 12 weeks from our Series C demo and our previous supplier couldn't deliver prototypes in time. ApexForge turned around 50 functional 5-axis CNC brackets in 3 weeks and had production capacity locked in for the same week. Their DFM review caught two tolerance issues our engineering team had m”
How we work
One hydraulic press or a 60,000 BPH bottling hall — the sequence is the same every time, and every step has a deliverable and a name against it.
Send drawings, sample parts, throughput target and shift pattern. An application engineer — not a salesperson — runs the DFM review and tells you plainly whether your part suits this machine.
You get a machine recommendation, a plant layout, a capacity calculation against your real material, and an indicative price. No deposit to see any of it.
You get a production slot, weekly factory photos of your machine on the floor, and an FAT date in the calendar before the first sheet is cut.
Your machine runs your parts, to your drawing, on the gauges we ship with it. You or your third-party inspector can watch live and sign off remotely.
Our engineers travel with the machine, install, commission, train the operators and hand over the manual set. Two-year mechanical warranty, then the hub network.
In their words
Collected from customer plant leadership on projects that passed final acceptance.
ApexForge delivered a complete 60,000 BPH water bottling line from kickoff to first commercial sale in 7 months. Their project team handled everything — layout, machines, integration with our existing utilities, operator training and regulatory documentation. Six months in, our OEE is 88% — which is
The old jet-box dryers were 18 years old and we had stopped getting spare parts. ApexForge proposed two AF-VD-2400 roller dryers with biomass hot-water heating — we already had a biomass boiler so the integration was simple. They commissioned both machines in 8 weeks and our operators were running f
We were 12 weeks from our Series C demo and our previous supplier couldn't deliver prototypes in time. ApexForge turned around 50 functional 5-axis CNC brackets in 3 weeks and had production capacity locked in for the same week. Their DFM review caught two tolerance issues our engineering team had m
Installed base
Customer names are withheld under NDA — shown here by vertical and region.
Quality & compliance
A certificate on a wall proves nothing. This section states exactly what travels with the machine, and what you can verify without trusting us.
Certificate numbers and validity dates ship in every machine’s document pack and can be verified directly with the issuing body.
Request a quote
Send part drawings, capacity targets and budget. An application engineer comes back within 24 hours with a machine recommendation, a layout sketch and an indicative quote — at no cost and with no obligation.
Request a quote
The more specific you are, the more useful the answer: material, hourly target, budget band, delivery port. You will not get a mass-mailed price list back.