Numbers you can check

Customer identities are withheld under NDA, so these are shown by vertical and region. Every figure was verified against the customer’s own plant records before publication.

3 projects

SA

Saudi Arabia

Confidential (top-3 Saudi Arabian bottled water producer)

Saudi Water Bottler: 60,000 BPH Line from Cold Start in 7 Months

Greenfield 60,000 BPH water bottling line: blowing, filling, capping, labeling, shrink-wrapping and palletizing. Cold-start to first commercial sale in 7 months (vs 14-month industry average). OEE run

“ApexForge delivered a complete 60,000 BPH water bottling line from kickoff to first commercial sale in 7 months. Their project team handled everything — layout, machines, integration with our existing utilities, operator training and regulatory documentation. Six months in, our OEE is 88% — which is”

— Plant Manager, Saudi water bottling facility
Read the project
VI

Vietnam

Confidential (top-10 Vietnamese plywood exporter)

Vietnamese Plywood Mill: Annual Throughput Doubled with AF-VD-2400 Dryer

Replaced three legacy Chinese-made jet-box dryers with two AF-VD-2400 roller dryers. Annual throughput doubled from 18,000 m³ to 38,000 m³. Veneer defect rate fell from 5.8% to 0.9%. Energy consumptio

“The old jet-box dryers were 18 years old and we had stopped getting spare parts. ApexForge proposed two AF-VD-2400 roller dryers with biomass hot-water heating — we already had a biomass boiler so the integration was simple. They commissioned both machines in 8 weeks and our operators were running f”

— Production Director, Vietnamese plywood mill
Read the project
UN

United States

Confidential (Boston-based Series B robotics startup)

US Robotics Startup: 5-Axis CNC Brackets in 6 Weeks, Zero Rejects

Compressed 4-month timeline into 6 weeks. 50 functional prototypes in week 3, then ramped to 800 pieces/month in week 8. Zero defects on first 8 production batches (6,400 parts). Cpk > 1.67 on all 5 c

“We were 12 weeks from our Series C demo and our previous supplier couldn't deliver prototypes in time. ApexForge turned around 50 functional 5-axis CNC brackets in 3 weeks and had production capacity locked in for the same week. Their DFM review caught two tolerance issues our engineering team had m”

— VP Hardware, Boston robotics startup
Read the project

Want to see a project like yours?

Tell us your vertical and your throughput target. We can arrange a factory visit or a video call with an existing customer in a comparable line.